Only one visit was made to the site in November. On Sunday, the 11th, Four AIM members endeavoured to survey the outer enclosure (see photographs below).


Pegs and poles were inserted on the bank of the outer enclosure every 7/8 metres. Measurements were then recorded on AIM’s Total Station at these points and at one metres distances up and down Trench 9 (see graphic below).
