In June, AIM’s Total Station was used to survey Trench 9 onto a graphic created during the 2010/2011 investigations (the graphic below shows the rectangle of 16 crosses which show the position of Trench 9).
Excavations continued and a Worked Flint (?) was unearthed in Square C (see photograph below).
